Mitsubishi Electronics SW1DNC-GXW2-E Instrukcja Użytkownika Strona 106

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 110
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 105
5 - 18
5.4.2 Batch monitoring of device values
5 CREATING TWO OR MORE PROGRAM BLOCKS
GX Works2
5.4.2 Batch monitoring of device values
Refer to the following section for the Batch monitoring of device values.
3.4.2 Batch monitoring of device values
5.5 Diagnosing the programmable controller
You can check the programmable controller RUN/STOP status and error status.
Refer to the following section for the diagnosis procedure:
3.5 Diagnosing the programmable controller
5.6 Reading a Project from programmable controller
Refer to the following section for the procedure to read a project from the programmable controller:
3.6 Reading a Project from programmable controller
6. Select [Online] [Monitor] [Stop Monitoring
(All Windows)] to reset the monitor status on all
monitored screens.
You can also click Stop Monitoring (All Windows)
to reset each monitored screens.
7. Set the programmable controller CPU to STOP.
Set the RUN/STOP switch on the programmable
controller CPU to "STOP".
You can switch the programmable controller status
between "RUN" and "STOP" using remote
operation.
"Point" in the step4
Przeglądanie stron 105
1 2 ... 101 102 103 104 105 106 107 108 109 110

Komentarze do niniejszej Instrukcji

Brak uwag